COLLEGE OPERATIONSUpdated as at 12.30pm 09/09/2010
The College is intending to reopen for On Campus students on Monday 13th September. Please refer to the specific details as outlined below, for your current stage of study.
Stage 1 students: Stage 1 students are not to attend practicum on Monday 13 September. They are to attend College at 1:00pm Monday. They will be given an update on practicum arrangements. Stage 2 students:
Classes will recommence Monday 13th September. Your timetable will be posted online by Friday 10th September.
Note: assessment TS2 AS3 - Inclusive Learning Environment essay, originally due 6th September is now due Monday 13th September.
Assessment CS2 AS12 working with parents / whanau report originally due on 16th September is now due Thursday 23rd September.
Stage 3 students: Classes will recommence Monday 13th September. Your timetable will be posted online by Friday 10th September. The Stage 3 assessment timeline remains unchanged with the exception of the presentation assessment MS3 AS13b, which will be completed during the week commencing Monday 13th September. - all students should bring their own drinking water
Distance programme: The distance programme operations of the College are functioning. College building The College building has been assessed by the building owners. A structural check has been completed by structural engineers. A health and safety check has also been completed and the building has been cleared for use. The College management also arranged a civil and structural engineer to check the building who has cleared it for use. The building did sustain some superficial cracks to external plaster. Updates Please continue to monitor this website which will be updated if the situation changes.
|